MRI Upgrade
St. Vincent’s Medical Center, Bridgeport, CT
This was a five week very fast pace job with many moving parts. Before the existing MRI Lab could be demoed, a temporary MRI trailer was installed on the side of the building. After tents, ramps and temporary lighting was installed outside, construction then began inside. After demo, our job scope became installing a new feed for this machine, installing and wiring all the new equipment in the control room for GE and new lighting in the lab. Another fast pace job, but with the right communication, everyone succeeded in the end.